8 men can complete a work in 12 days in how many days can 6 men complete the same work
plz give full answer otherwise it will be reported
Answers
Answered by
2
assume that all of the men work at the same rate. If 12 men can do it in 8 days and each man does the same portion, 1 man can do 1/12 of the job in 8 days or 1/(12*8)=1/96 of the job per day. In order to do it in 6 days, the overall rate needs to be 1/6 of the job per day. 1/96 (jobs/day)/worker * w workers=1/6 jobs/day, (1/6)/(1/96)=16 workers.
Answered by
4
Answer:
16 days
Step-by-step explanation:
8/6*12
= 4/3*12
=12*4/3
=4*4
=16 days