Math, asked by harjotveergabbi, 1 month ago

8 men can do a piece of work in 28 days.1 man does the same in----- days.14 men do the same in ---days. ​

Answers

Answered by Anonymous
3

1 man=28/8 and 14 men = 2 days

63.0

Step-by-step explanation:

if 8 men can do a work = 28 days

1 men can do a work = 28/8 days

14 men can do a work = 28/14 = 2 days

pls give me thanks

vote my ans

plssssss follow me

mark me brainliest

Answered by IamTamanna2006
1

Answer:

8 men can do a piece of work in 28 days.

1 man does the same work =

28 \times 8 = 224

1 man does the same work in 224 days.

14 men do the same in =

 \frac{224}{14}  = 16

14 men do the same in 16 days.

Hope it helps...