85 men can do a piece of work in 90 days how long will 102 men take to do the same work​

Answers

Answered by bandaruramana1977
0

Answer:

107 days long to do same work

Answered by Pony2007
0

Answer:

it will take 108 days.

Step-by-step explanation:

85 men take 90 days

1 man takes (90÷85) days

102 men will take (90÷85)×102 days

= 108 days