A 200 mw thermal power plant has peak load of 130 mw. The power station supplies load to four town having their maximum demand of 30 mw, 40 mw, 25 mw and 45 mw. The annual load factor is 65%. Find: (i) average load on the plant (ii) energy supplied per year (iii) diversity factor (iv) demand factor (v) plant capacity factor.
Answers
Answered by
0
(b) A 200 MW thermal power plant has peak load of 130 MW. The power station supplies load to four town having their maximum ...
Answered by
2
A 200 MW thermal power plant has peak load of 130 MW. The power station supplies load to four town having their maximum .