A 271⁄2-mile stretch of road needs repaving. A company bid on the repaving project, saying they could repave 21⁄4 miles of road per week. How many weeks will the company take to completely repave the stretch of road? A. 122⁄9 B. 131⁄2 C. 151⁄2 D. 121⁄3

Answers

Answered by TPS
0

\text{To repave $\frac{21}{4}$ miles, time needed = 1 week}\\ \\ \text{To repave $\frac{271}{2}$ miles, time}\\ \\ \text{needed }= \frac{271}{2}  \div  \frac{21}{4}  = \frac{271}{2}  \times  \frac{4}{21}   =  \frac{542}{21} \:  weeks \\  \\ answer = \frac{542}{21} \:  weeks
Answered by BrainlyFlash156
20

\huge\mathcal{\fcolorbox{cyan}{black}{\pink{ĄNsWeR࿐}}}

\text{To repave $\frac{21}{4}$ miles, time needed = 1 week}\\ \\ \text{To repave $\frac{271}{2}$ miles, time}\\ \\ \text{needed }= \frac{271}{2}  \div  \frac{21}{4}  = \frac{271}{2}  \times  \frac{4}{21}   =  \frac{542}{21} \:  weeks \\  \\ answer = \frac{542}{21} \:  weeks