Physics, asked by emereyisrael, 10 months ago

A 40 kg can of paint rest on ledge 20 m above the ground. A taut rope attached to the can passes over a pulley and straight down to a 3.0 kg can of nails. If the can of paint is accidentally knocked of the ledge, how much time does a carpenter have in order to catch the can of paint before it smashes on the ground?

Answers

Answered by ishtikharkhanup
1

Answer:

it takes time of 9 seconds only

Answered by Fatimakincsem
5

Thus the time required is t = 5.345 s

Explanation:

  • t = ?
  • d = 20m
  • Vi = 0m/s
  • d = Vit*(1/2)at^2
  • t =  √ (2d/a)

a = ?

a = Fnet/mnet

m1 = 4kg

m2 = 3kg

a = Fnet/mnet

= (Fg1 - Fg2)/(m1 + m2)

= (m1g - m2g)/(m1+m2)

= g(m1-m2)/(m1+m2)

= 9.81m/s^2(4kg-3kg)/(4kg+3kg)

= 9.81mkg/s^2/7kg^2

a=1.4m/s^2

t = √(2d/a)

d = 20m

a = 1.4m/s^2

t = √(2(20m)/1.4m/s^2)

= √40m/1.4m/s^2)

t = 5.345 s

Thus the time required is t = 5.345 s

Similar questions