Math, asked by varshitha1234510, 10 months ago

A 440 m long road is being repaired. At the end of the three days, the workers had repaired - of the
4
road. What length of the road is left unrepaired?​

Answers

Answered by prishabisht0
1

Answer:

110m

Step-by-step explanation:

Total length of the road : 440m Total length of the road repaired: 3/4 i.e: 440/4 = 110m * 3 = 330m Balance length to be repaired = 440 - 330 = 110m.

Similar questions