Math, asked by ms90, 3 months ago


A 500m length of road is to be repaired. After one day, the workers had repaired 2/5
of the road. What length of the road is left unrepaired ?

Answers

Answered by srivastavaabhisek826
8

Step-by-step explanation:

Total length of road = 500 m

Workers repair road = 2/5 of total length

Road to be repaired = ?

2/5of 500 m = 200 mtr

Road to repair = 500-200 =300 mtr

Answered by sriniketmaster2009
11

Answer:

Step-by-step explanation:

Length of the road to be repaired= 500m

road repaired after 1 day= 2/5*500

road repaired after 1 day=200m

therefore the length of the road left unrepaired=500m-200m

                                                                              =300m

hope it helps

please mark the brainliest  