Math, asked by kebishabright, 4 months ago

A and B, B and C, C and A work on a job consecutively for 2 days each and then complete the job. If all the three work together, then how many days will it take for them to complete the job?

Answers

Answered by MihiraShaik10
2

Answer:

Let A, B, C can do a job alone in a, b, c days.

A and B together can do in 2 days.

a

1

+

b

1

=

2

1

-------(1)

B and C together can do in 4 days.

b

1

+

c

1

=

4

1

------(2)

C and A together can do in

5

12

days.

c

1

+

a

1

=

12

5

-------(3)

(1) - (2), ⟹

a

1

c

1

=

4

1

-------(4)

(3) + (4), ⟹

a

2

=

12

8

∴a=3

∴ A can do job in 3 days.

Answered by nerdyJR
0

Answer:

you didn't told how much time the job takes to couple by 1 person ..

in my point of view it depends on how hard the job is if it's easy then they need 6 days to complet because each have doned job with each other consiq utly

Similar questions