Math, asked by anubhachamba, 3 days ago

A and B can complete a certain job in 20 days and 30 days respectively. They start the job together and work for 3 days. Then B falls sick and is unable to work for 5 days. During this period A works alone. After this period, B again join him and they completed the work together. In how many more days will the work be completed?​

Answers

Answered by xXbrainlykibacchiXx
7

Answer:

A silo is a structure for storing bulk materials. Silos are used in agriculture to store grain or fermented feed known as silage. Silos are commonly used for bulk storage of grain, coal, cement, carbon black, woodchips, food products and sawdust. Turn your PC off completely

Turn your PC off completelySelect Start and then select Power > Shut down. Move your mouse to the lower left-hand corner of the screen and right-click the Start button or press Windows logo key + X on your keyboard. Tap or click Shut down or sign out and choose Shut down. and then click the Shut down button.Cotton is a soft, fluffy staple fiber that grows in a boll or protective capsule, around the seeds of cotton plants of the genus Gossypium in the family of Malvaceae. The fiber is almost pure cellulose. Under natural conditions, the cotton bolls will tend to increase the dispersion of the seeds. Cotton is a seed hair fiber produced from epidermal seed coat. The tongue is vital for chewing and swallowing food, as well as for speech. The four common tastes are sweet, sour, bitter, and salty. A fifth taste, called umami, results from tasting glutamate (present in MSG). The tongue has many nerves that help detect and transmit taste signals to the brain.

Answered by Anonymous
376

\huge\pink{\boxed{\green {\mathbb{\overbrace {\underbrace{\fcolorbox{red}{aqua}{\underline{\pink{ur\: answer }}}}}}}}}

we can use LCM METHOD..

As A can complete the work in 30 day. Surely... B could complete the work in 20 days.

Step-by-step explanation:

Here, we are going to calculate LCM of 30 and 20.

The total unit of work= LCM(20,30) = 60 units

So, the number of unit work done by A = 60/30=2 units

And, the number of unit work done by B = 60/20=3 units

As per the given information, B leaves the work 5 days before the work is finished.

Therefore, A would be working alone for the last 5 days and the amount of work done by A during those days= 2*5= 10 units

Therefore, Remaining amount of work = 60-10 = 50 units

These 50 units of work is done by both A and B together.

Therefore, working together work done per day by A and B = 2+3 = 5 units

Therefore, to complete 50 units of work A and B together requires = 50/5 = 10 days

So the total number of days to finish the work = 10+5= 15 days.

Therefore ur answer is 15 dayss..

Step-by-step explanation:

hopes it's helps you :)

Similar questions