A and B can do a piece of work in
30 days; B and c in 24 days ;c
and A in 40 days. How long will it
take them to do the work together
In what time can each finish it,
working alone ?
Answers
Answered by
19
Answer:
If they work together it will take 20 days
It takes 120 days for A ,40 days for B and 60 days for C.
Step-by-step explanation:
Given:
(1/A)+(1/B)=(1/30)
(1/B)+(1/C)=(1/24)
(1/C)+(1/A)=(1/40)
add both sides
(1/A)+(1/B)+(1/B)+(1/C)+(1/A)+(1/C)
=(1/30)+(1/24)+(1/40)
(1/A)+(1/B)+(1/C)=1/20
1.Answer =20
(1/A)=(1/20)-(1/B+1/C)
(1/A)=1/120
Therefore,A takes 120 days
similarly,
B takes 40 days and C takes 60 days