A and B can do a piece of work in 72 days. B and C in 120 days and A and C in 90 days in what time can A alone do it ?
Answers
Answered by
49
Answer:
120 days
Step-by-step explanation:
Let A,B and C can do a piece of work in x,y and z days respectively.
So, A's , B's and C's one days work are 1/x,1/y and 1/z respectively.
now,
1/x + 1/y = 1/72 ...(1)
1/y + 1/z = 1/120 ...(2)
1/z + 1/x = 1/90 ...(3)
now, we add eq (1),(2) and (3)
2( 1/x + 1/y + 1/z ) = 5+3+4/360
1/x + 1/y + 1/z = 1/60 ...(4)
on solving eq (4) and (2)
1/x = 1/60 -1/120 = 1/120
Hence, A alone will complete the work in 120 days.
___________________________
Answered by
36
Answer:
A and B =72
B and C= 120
A and C= 90
LCM of 72,120,90 = 360
then
A and B= 5
BC = 3
C and A = 4
a + b + c = 12/ 2 ( because A,B,C is two time )
ABC =6
BC =3
then A = 3
now
=360/3
= 120
So 120 is answer .
Thanks .