A and B can finish a piece of work in 16 days and 12 days respectively I started the work and worked at it for two days he was then joined by b find the total time taken to finish the work
Answers
Answered by
2
Answer:
8 days
Step-by-step explanation:
A can do 1/16 work in 1 day.
B can do 1/12 work in 1 day.
Total = 1/16 + 1/12 = 7/48 work
A did work for 2 days.
That is he did 1/8 of the work, and 7/8 is left.
Both of them must do 7/8 work, and can do 7/48 work in a day
Therefore time taken is (7/8)/(7/48) which is 6. A worked on it for 2 days. Therefore, total day taken = 6 + 2 = 8 days.
Hope it helped you!