A and B can finish a piece of work in 16 days respectively. A started the work and worked at it 2 days.He was then joined by B.find the total time taken to finish the work..
Answers
Answered by
1
Answer:
ie jesus 3heueie j2jwneueueuwuw
Answered by
0
Answer:
The left work is done by B in 12 days .
Step-by-step explanation:
Given as :
A and B can finish a piece of work in 16 days
A started the work and worked at it 2 days
Let The left work is done by B in d days
So, A 1 day work =
And A 2 days work =
Left work = 1 -
Or, left work =
∵ = constant
i.e d = 16 ×
or, d = 12
Hence, The left work is done by B in 12 days . Answer