A and B can finish a piece of work in 20 days, B and C can finish it in 15 days, C and A in 10 days. Time taken by them together to do this work is?​

Answers

Answered by akhileshkumar2y2
0

Answer:

5 day time taken together to do this work this is correct answer please choose me for brainliest answer

Answered by illuminati707
1

A + B do (1/20)th of the work in 1 day.

B + C do (1/10)th of the work in 1 day.

C + A do (1/12)th of the work in 1 day.

2A + 2B + 2C do (1/20)+(1/10)+(1/12) = (12+24+20)/240 = (56/240)th of the work in 1 day.

A+B+C do (28/240)th of the work in 1 day.

So, A, B and C will do the same work in 240/28 = 60/7 = 8 and 4/7 days.