Math, asked by raquib4, 1 year ago

A and B can finish a piece of work in 5 days, A and C in 10 days and B and C in 15 days. How much work will they do together in 2 days?


raquib4: 11/30 is answer

Answers

Answered by santoshkandwal
1
Hope it helps you.....
Attachments:

raquib4: correct answer
raquib4: a boat can travel with a speed of 22 km/hr in still water. If the speed of the river is 4 km/hr, find the following

a. Time taken to travel 104 km downstream.

b. Time taken to travel 117 km downstream and return to the same spot.
Similar questions