A and B can finish a piece of work in 6 and 4 days respectively then A started the work and work for 2 days he was then joined by B find the total number of time taken to finish the work
Answers
Answered by
1
Answer:
3.6 Days
Step-by-step explanation:
Let say W is piece of Work to be done
6A = W
4B = W
6A =W
2A = (W/6A)*2A = W/3
Remaining work = W-W/3 = 2W/3
A & B together can do in 1 day = W/6 + W/4 = 5W/12
5W/12 is done in 1 day
2W/3 is done in = (1/(5W/12))* (2W/3)
= (12/5W)*(2W/3)
= 24/15 = 8/5 days
total days = 2 + 8/5 = 18/5 = 3.6 Days
ashi9273:
plz tell fast
Similar questions