A and b can together complete a work in 10 days, b and c can together complete the work in 12 days while a and c together, takes 15 days to complete the same work. Find the number of days required by c to complete the work alone.

Answers

Answered by zaidkhan620305
0
Work done by both a and b =1/4 (in one day)

Work done by a =1/12 (work done in one day)

1/4–1/12 LCM =12

1/6=1/1/6 (6 multiplies mathematical operation)

Ans =6 daysWork done by both a and b =1/4 (in one day)

Work done by a =1/12 (work done in one day)

1/4–1/12 LCM =12

1/6=1/1/6 (6 multiplies mathematical operation)

Ans =6 days



Answered by sprao534
1
Please see the attachment