A and B will do one work in 15 days and B and C will do the same work in 12 days and C and A in the same day within 10 days.
Answers
Answered by
4
Answer:
(A+B)=1/15
(B+C)=1/12
(C+A)=1/10
2(A + B + C)=1/2(1/15+1/12+1/10)=1/2(6+4+5/60)=1/2(15/60)=1/8
together a,b,c can finish in 8 days.
A=(A + B+C) - ( B+C) =1/8-1/12=3-2/24=1/24
B= (A + B + C ) - ( A + C)
=1/8-1/10=5-4/40=1/40
C=(A+B+C)- (A+B)
=1/8-1/15=15-8/120=7/120
A=24days,B=40days,c=120/7
msahota395:
answer is 40 but ans step by step
Answered by
0
Answer:
hey a+b+c=7.5
b+c=5
substitute
a=7.5-(b+c)
a=2.5
Step-by-step explanation:
A+B = 15
B+C = 12
A+C = 10
Lcm of (12,15,10) = 60
Efficiency is
A+B = 4
B+C = 5
A+C = 6
Total efficiency
2 (A+B+C) = 15
A+B+C = 15/2
Individual efficiency
A = 7.5-5=2.5
B = 7.5 - 6 = 1.5
C = 7.5 - 4= 3.5
Individual time taken
A = 60/2.5 = 24 days
B =60/1.5 = 40 days
C = 60/3.5 = 17 days
Similar questions