A and B working together can do a piece of work in 4 1/2 hours. B and C working together can do it in 3 hours. C and A working together can do it in 2 1/4 hours. All of them begin the work at the same time. Find how much they will take to finish the piece of work.
Answers
Answered by
13
Work done by A in 1 hour = 1/4
Work done by B and C in 1 hour = 1/3
Work done by A and C in 1 hour = 1/2
Work done by A,B and C in 1 hour = (1/4)+(1/3) = 7/12
Work done by B in 1 hour = (7/12)–(1/2) = 1/12
=> B alone can complete the work in 12 hour
Work done by B and C in 1 hour = 1/3
Work done by A and C in 1 hour = 1/2
Work done by A,B and C in 1 hour = (1/4)+(1/3) = 7/12
Work done by B in 1 hour = (7/12)–(1/2) = 1/12
=> B alone can complete the work in 12 hour
EvelynXxX:
PLZ ZMARK AS THE BRAINLIEST IF U FOUND SO
Similar questions