Answer:
A and B do (1/6)th of the work in a day.
A alone can do (1/9)th of the work in a day.
So B does (1/6)-(1/9) = (6/36)-(4/36) = (2/36) = (1/18)th of the work in a day.
So B will take 18 days to do the work working alone.