A and B working together take 15 days to complete a piece of work If A alone can do this work in 20 days,how long would B take to complete the same work?​

Answers

Answered by sanaph1122
0

Answer:

60 days

Work done in one day

A+B=1/15

B=1/20

Therefore, A= 1/15–1/20 ( work done in a day by A)

=(20–15)/300

=1/60

A requires 60 days to complete the task.

hope this helps ❤️