Step-by-step explanation:

A and B together do (1/12) +(1/15) = (5/60) + (4/60) = 9/60 or 3/20th of the work in a day. So the two working together will take (3/5)/(3/20) = (3*20/(5*3) = 4 days. A and B will complete the work in 4 days after C had left them.