a block layer takes two days to lay 100 blocks how long will he take to lay 300 blocks at the same rate
Answers
Answered by
0
no. of blocks layed by block layer in 2 days:-100 blocks
in 1 day he will lay:-100/2=50 blocks
He takes 1day to lay 50 block.
so, no. of days to lay 300 blocks:-300/50=6 days
Answered by
0
Answer:
6 days because if it takes 100 in two days it take 300 in 6 days