Physics, asked by anshgarg, 1 year ago

A block of mass 30 kg is being brought down by a chain. If the block acquires a speed of 40cm/s in dropping down 2m. The work done by the chain during the process will be..??

Answers

Answered by DiyaDebeshee
131
Initial velocity, U = 0 

Final velocity , V = 40 cm/s
                             = 0 .4m/s 

so, now we can calculate by,
V²-U² = 2aS 
S = 2m (given)
so by substituting the values we will get,
(0.04)
² - (0)² = 2 x a x 2
a = 0.04 m/s^2 


as we know,

Force = Mass * Acceleration 
Force = 30 x 0.04 
Force = 1.2 N       

Force bcoz to gravity = 30 *X 9.81
                                      = 294.3 N 

Resultant Force = 294.3 – 1.2
                              = 293.1 N 


Work Done = Force X distance covered
Work done = 294.3 X 2
                    = 586.2 Nm


anshgarg: thats a one line answer LOL
anshgarg: use work energy theroem W(chain) + W(gravity) = 0.5mv^2
Answered by 2703saksham
0

Answer:

-586 joules of work is done by the chain

Similar questions