A bucket filled with water weighing 20 kg is raised from a well of depth 20m. If the linear density of
the rope is 0.2 kg per meter, the amount of work done is, (g = 10ms-2) (in J)
Answers
Answered by
1
Answer:
I think later about it
Ok or not
Similar questions