A bucket of water 50 kg is raised from a depth of 100m. to the ground by a rope. the mass of the rope is 1kg/m what is work done.
Answers
Answered by
1
Answer:
work done =50*100=5000+work done for lifting rope
=5000+100*1=5100N
Similar questions