Physics, asked by Nanidini, 9 months ago

A bucket of water 50 kg is raised from a depth of 100m. to the ground by a rope. the mass of the rope is 1kg/m what is work done.

Answers

Answered by erwinchacko52
1

Answer:

work done =50*100=5000+work done for lifting rope

=5000+100*1=5100N

Similar questions