A build is triggered whenever there is a change in the _________. upstream or downstream
Answers
Answered by
0
Configured project that boosts a project as its execution is an upstream job.
Downstream job is a configured project that is boosted as part of pipeline run in computer.
Upstream and downstream jobs favours you to configure the successive execution for variety of operations and so you can arrange the run flow.
Answered by
3
Upstream: The process where searching for raw materials and extracting them is referred to as upstream process.
Downstream: The processing of raw materials into finished process is referred to as downstream process.
The build parameters are triggered using parameterized post-build trigger during the upstream process.
Hence, A build is triggered whenever there is a change in the Upstream.
The answer is upstream.
Similar questions