A can complete a work in 50 days and B can in 40 days Find the work left after A has worked on it for 20 days
Answers
Answered by
0
the answer is 70days
Answered by
0
Answer: allegation method
A B
50 40
200
4 : 5
So total work 200
A worked for 20 days so he finished 80works
Work left is 120/200
Answer: 3/5