A can do a piece of work in 24 days and b in 30 days. with help of c, they finish the work in 12
days. in how many days c alone can do the same work?
Answers
Answered by
1
Step-by-step explanation:
Combine efficiency of work done by a and b = 1/24 + 1/30;
1/a + 1/b = (5+4)/120;
1/a + 1/b = 9/120;
Combine efficiency of a, b and c is = 1/a + 1/b + 1/c;
1/a + 1/b + 1/c = 1/24 + 1/30 + 1/c = 1/12;
Now Putting the value of 1/a + 1/b is above equation we get;
9/120 + 1/c = 1/12;
1/c = 1/12 - 9/120;
1/c = 10-9/120;
1/c = 1/120;
120 days required for c to the work alone.