A can do a piece of work in 8 days and B in 10 days and C in 16 days. B and C work together for 4 days and then C is replaced by A. find when the work is finished.

Answers

Answered by VishalRai46
2

Answer:

14/9 Days or 1+ 5/9 days

Step-by-step explanation:

In 4- days B and C complete =4/10+4/16

= 2/5 + 1/4

= (8+5)/20

= 13/20

The remaining (1–13/20) =7/20- part of the work is done by A and B.

The number of days in which the work will be done by A and Bus = 7/20/(1/8+1/10)

= 7/20/(18/80)

= 7/20 x 80/18

= 28/18

= 14/9 days.