A can do a piece of work in 9 days and b in 18 days. They begin together, but a goes away three days before the work is finished. The work lasts for
Answers
Answered by
0
Answer:
The work lasts for 15 dayd
Answered by
3
Step-by-step explanation:
let work lasts for x days.
A does work for (x-3) days.
In 1 day, A does 1/9 part of work.
In (x-3) days A does (x-3)/9 part .
now in 1 day, B does 1/18 part.
in x days, B does x/18 part of work.
A and B together do 1(whole) part of work.
Hence, (x-3)/9 + x/18 = 1
- 2x-6+x/18=1
- 3x-6= 18
- 3x= 24
- x = 8
So the work lasts for 8 days.
Hope you get the answer.