A can do a piece of work in 9 days, B is 50% more efficient than A . In how many days the same piece of work can be done if they work together.
1-3.6 days
2-3 days
3-5/18 days
4-None
Answers
Answered by
2
Answer:
3-5/18 days
pls mark me as brainleast
Answered by
0
Answer:
a can do that work in 9 days
In 1 day work done by a = 1/9
then b can do that work in 6to 7 days
In 1 day work done by b = 1/6
if both work then work done in one day =1/9 + 1/6
=6/18 = 1/3
so 9 work will be done in
3 days answer