A can do a piece work in 120 days and b can do it in 150 days. they work together for 20 days. then b leaves and a continues the work alone, 12 days after that c joins a and the work is completed in 48 days more. in how many days can c do it if he works alone?
Answers
Answered by
37
I think that the answer will be 240 days
Answered by
33
A one days work = 1/120
B one days work = 1/150
(A+B) one days = 1/120+1/150=3/200
(A+B) 20 day work =3/200×20=3/10
A s 12 days work =1/120×12=1/10
C join =3/10+1/10=2/5
Ramining work =(1-2)/5=3/5
(A+C)48 days work =3/5×1/48=1/80
C one days work =1/80-1/20=1/240
C days=240 Ans
Similar questions