A can do worl in 21 days and
b. Caan in do in 24 days b started working and after few ddays a joined him to complete ghe work afyer how many days did a join if thw work is completed in 16daays
Answers
Answered by
0
Answer:
9 days
Step-by-step explanation:
Assumption: They are both doing same work.
Let W be the whole piece of work.
Let x be the days when B is working alone.
Then, B and A will be working together for (16-x) days.
A does a piece of work in 21 days.
B does a piece of work in 24 days.
So, we have
x times (W/24) + (16-x) times (W/21+W/24) = W
Cancelling W throughout, on both sides, we have,
x(1/24)+(16-x)(1/21+1/24)=1
Solving this further, (factoring out 1/3 and multiplying by 3 on both sides),
Simplifying,
x/8+15(16-x)/56=3
7x+240-15x=3*56
240-168=8x
72=8x
x=9
Similar questions