a company estimated manufacturing overhead cost for $420000.the total estimated labour hours are 15000 hours.an the estimated machine to be worked is 6000 hours.the company allocates its manufacturing cost based on direct labour hours.what is predetermined labour allocation rate?
Answers
Answered by
2
Explanation:
In electronics and electrical engineering, a fuse is an electrical safety device that operates to provide overcurrent protection of an electrical circuit. Its essential component is a metal wire or strip that melts when too much current flows through it, thereby stopping or interrupting the current.
Similar questions