A conductor hires 120 men to complete a job in 6 months .How many men should he hire if he has to complete the job in 4 months?

Answers

Answered by AnanyaSrivastava999
2
men hired = 120
time taken = 6

time he wants for the work to be done = 4
therefore number of men needed = x
=> x/120 = 6/4
=> x = 3×120/2
=> x = 180 men ..

shine33: Thanks and have a good day
AnanyaSrivastava999: wlcm :)