A construction worker uses 300 N to lift a piece of sheet metal. The sheet metal was carried 5 m in 57 s. How much power was used by the construction worker?
Answers
Answered by
1
Answer:
work done = F×D
=300×5
1500J
power =1500/57
=26.31 W