A construction worker uses 300 N to lift a piece of sheet metal. The sheet metal was carried 5 m in 57 s. How much power was used by the construction worker?

Answers

Answered by ajaychaudhary135
1

Answer:

work done = F×D

=300×5

1500J

power =1500/57

=26.31 W

Explanation:

mark as brainliest

Answered by kunduswarnali01
0

Answer:

don't know the answer.

thank u