a contractor undertook to finish a road 12 km long in 350 days, but after employing 45 men for 200 days he found the only 4 km of road were built. How many additional men must be then engaged to finish the work in given time ?​

Answers

Answered by rasbiharisharma33
0

Answer:

75

work completed within 200 days is 4 km with 45 men.

for this total men is 45×200= 9000

for 1km 9000÷4= 2250.

rest road to be made is 12-4=8

so, total required men power is 8× 2250= 18000.

but i have 350-200= 150 days.

so, per day required men is 18000÷150= 120.

therefore, required additional men power is 150-45= 75