a crane pulls up a car of mass 500kg to a vertical height of 4m. calculate the work done by the crabe
Answers
Answer:
Therefore, the work done by the crane is obtained as W=19600J=19.6kJ. So the correct option is B. Note: Here the force acting on the car is the tension in the arm of the crane and the displacement of the car is the vertical height to which the car is raised.
Given:-
Car mass - 500 kg
Height - 4 m
To Find:-
Work Done by Crane
Explanation:-
To lift the car, the crane has to do work against the force of gravity.
∴ Force required to lift car is F = mg
Force = mass × gravity
mass is given and gravity is 9.8 ( gravitational constant )
= 500 × 9.8 N
= 500 ×
one zero of 500 get cancels with one zero of 10
= 50 × 98
= 4900 N
∴ Work done, W = F × S
where S is Displacement = Vertical height = 4m
Work Done = 4900 × 4 J
= 19600 J
converting into Kj we get
=
= 19.6 Kj
∴ Work Done By Crane is 19.6 Kj