A crane was used to lift up 10 bags of cement (1 bag of cement = 50kg) to a height of 12m. Calculate the work done by the crane.
Answers
Answered by
0
Answer:
ph boi just google it or something else bruv
Answered by
1
Answer:
mgh= 50×10×12= 6000
this is the work done
Similar questions