A feasibility study is carried out (A) after final requirements specifications are drawn up (B) during the period when requirements specifications are drawn up (C) before the final requirements specifications are drawn up (D) at any time
Answers
Answered by
0
Answer:
C)
Explanation:
before the final requirements specifications are drawn up
Answered by
0
Option “C” is the correct answer i.e. before the final requirements specifications are drawn up.
• A feasibility study is carried out before the final requirements specifications are drawn up
• A feasibility study (also recognized as feasibility analysis) is an assessment of a business venture or project intended at determining its feasibility for execution and classifying potential blockages.
Hope it helped...
Similar questions