a field is 140 metre long and 36 metre board labourers are engaged to plough the field if a labourer can plough 120 square metre a day how many labourer are to be engaged to plough the field in a day
Answers
Answered by
4
Answer:
Step-by-step explanation:
Solutions :-
Given :
Length of field = 140 m
Breadth = 36 m
Find the area of field :-
Area of rectangle = (Length × Breadth) sq. units
= (140 × 36) m²
= 5040 m²
Find the number of labourers are to be engaged to plough the field in a day :-
We know,
1 labourer can plough 120 sq. m in a day.
120 m² = 1 labourer
5040 m² = (1 × 5040)/120 = 42 labourers
Hence,
42 labourers are to be engaged to plough the field in a day.
hope you THANKS PLS
Answered by
2
Answer:42
Step-by-step explanation:
Total Area of Field = 36*140
Area of field 1 laborer can plough = 120
No. of laborers = 36*140/120
No. of laborers = 42