Answer:

1000

Step-by-step explanation:

Length of foot track in metre(m) = 1000m

Width of foot track = 3m

Area of foot track = 1000×3 sq.m = 3000 sq.m

Area of square stone = 1×1 sq.m = 1 sq.m

No. of square stones required to pave track = Area of track/Area of stone

= 1000 sq.m/1 sq.m = 1000