A house in a remote area is wired to receive power both from the AC supply grid & four solar panels installed on the rooftop. The energy meter is installed for a maximum of 5.5kVA load with only four 15A rated wires from the meter supplying power to four different rooms. The solar panels provide power to the water heater & water pump independently of AC supply to the house. You are supposed to install an MCB in one of the rooms. Current to all the loads in the room flows through this MCB. The following loads are supposed to be used inside the room: 1> 2 lights: 0.5A each 2> Induction cooker: 5A 3> Washing Machine: 5A 4> 1 Air conditioner: 8A All current ratings are maximum continuous ratings of the loads. The MCB should trip after a maximum current of X ampere is exceeded. Find the value of X if a. The house is in India b. The house is in the US
Answers
Answered by
1
Answer:
what is this i cannot answer it
Answered by
1
Answer:
what is this set oiiiiiiiiiiiiiii ddddddddddd kkkkkkkkkk
Similar questions