A labourer can do a job in 50 hours. After 5 hours he takes a break. What fraction of the job is yet to be done?
A) 0.8 B) 0.5 C) 0.75 D) 0.9
Answers
Answered by
1
Answer:
option D) 0.9 fraction of the job is yet to be done
Step-by-step explanation:
i hope this helps u
Answered by
1
Answer:
D) 0.9 is the answer