Physics, asked by deepalghoghrey0, 5 months ago

A labourer having Mass 100kg carries a bag of mass 20kg to the top of building 98m high. Find work done if g=9.8meter per square second​

Answers

Answered by omgvola
1

Answer:

Im not pretty sure about this, pls check others answers too..

115248N

Explanation:

Total mass = 100+20=120kg

height=98m

g=9.8 m/s

therefore, work done= mgh = 120×9.8×98 = 115248N