. A man finishes a work in 18 days and b
can do the same work in half the time
taken by A. Then working together, what
part o the same work they can finish in a
day?
Answers
Answered by
7
A's 1 day work = 1/18
B's 1 day work = 1/9 [because B take half time than A]
(A+B)'s one day work =
So in one day 1/6 work will be done.
Anonymous:
using app or website tell me
Answered by
0
A is taking time 18
B is taking time 9
average = 9+18÷2
=27÷2
=13 days