Physics, asked by Asq7, 7 months ago

A mass of 10 kg is pulled up a slope at a steady speed by applying a force of 80N parallel to the slope as shown.Find the work done.
The distance in the direction of the force is 25m,height is 3m and the base of the slope in the diagram is 4m.​

Answers

Answered by KrishnaKumar01
1

Answer:

8 N

75 m

Explanation:

please mark me as a brianliest

Similar questions