A mine shaft is being drilled from the surface using a method that progress downward through the rock the same amount each day. In a 6-day period the drill went from-10 m to -46 m. What integer shall represent the drill's position relative to the surface after 25 days?
Answers
Answered by
38
Step-by-step explanation:
Given:
6 days work done is
-46-(-10)= -36m
find wirk done in 25 days
proof:
work done in 1 day is -36 ÷ 6 = -6m
fir 25 days -6X25 = - 150m
Hence the mine will be drilled to -150m downward in 25 days